H and H Contractors - Bathroom Project pictures, before and after pictures.
Client removed vanity and destroyed some tiles. | New Tile installed before grout. | Finished project |
House remodel -Bathroom
BEFORE |
AFTER |
|
|
|
|
|
|
Sink, Toilet, and Floor
|
|
Install tile after new shower valve was installed.
BEFORE | AFTER |
New toilet, vanity sink, recessed medicine cabinet, light fixture, re-grouted tile floor and tub surround, and paint.
BEFORE | AFTER |
This project had a new tile shower installed, new bathroom flooring, sink, sink cabinet, toilet.
BEFORE |
AFTER |
|
|
BEFORE |
AFTER |
Bathroom ceiling repair
CEILING REPAIR- BEFORE | CEILING REPAIR - AFTER |